News
Company News
2026-10
21
Review flatbed truck tarp failure, reinforcement changes, fleet coverage, handling time and observed costs. Send DERFLEX failure photos and replacement quantities.
2026-10
21
Evaluate fabric for refueling pads and fuel-transfer containment. Define the fuel blend, capture area, exposure time and assembly validation before sourcing.
2026-10
21
Develop a custom machinery tarp from equipment measurements to fitted equipment cover approval. Review openings, anchor points, panel drawings and first-article checks.
2026-10
21
Plan tarp deployment cycles and a roll tarp wear test. Track opening force, friction, repairs and availability on one identified cover and mechanism.
2026-10
20
Evaluate heavy duty tarp performance after weathering. Compare same-batch fabric, welded seams and edges, review raw-data requirements and plan climate-specific validation.
2026-10
20
Specify a PVC tarp cold flex test by temperature, bend radius, cycle count and weld orientation. Investigate tarp fold cracking and prepare a repeatable OEM test brief.
2026-10
20
Specify custom long jump pit covers with solid PVC or mesh, finished dimensions, reinforced edges and perimeter details. Send DERFLEX your pit drawing for a quote.
2026-10
20
Audit tarp batch traceability from source rolls to finished covers. Define OEM quality records, revision control, inspection, packing and after-sales evidence.
Consulting Services
+86-021-54361792 / 54361798
Email
sales@derflex.com