Layflat Supply Duct
Collapsible flexible duct for positive-pressure fresh-air delivery. It folds compactly for transport and can be extended as the tunnel advances.
DERFLEX supplies flexible tunnel ventilation duct assemblies configured around the fan, airflow direction, pressure, route length and installation method—not simply a nominal duct diameter. Positive-pressure layflat sections, wire-supported exhaust ducting, couplings, suspension details and project-specific PVC-coated textile options can be coordinated as one purchasing package.
Tunnel ventilation ducting creates a temporary or semi-permanent air path between an auxiliary fan and an advancing work area. In road tunnels, rail tunnels, metro excavations, hydropower headings and underground construction, flexible ducting is frequently selected because it can be transported in compact sections and extended as the heading moves.
The finished product is more than coated fabric sewn or welded into a tube. A usable system includes the duct body, longitudinal and circumferential seams, suspension points, end connections, reinforcement where needed, branch fittings and repair strategy. A manufacturer therefore needs to understand how each component interacts with pressure, airflow and site handling.
Layflat ducting is commonly used for forced-air supply. Fan pressure inflates the flexible tube and carries fresh air toward the heading. For suction or exhaust duty, the duct needs structural support—typically rings or a wire helix—so that negative pressure does not collapse the air passage. Low-headroom projects may also use oval or specially configured duct sections where a full round profile interferes with equipment clearance.
This distinction is important when comparing tunnel ventilation duct suppliers: a diameter alone does not define whether the duct will work with the planned fan and route.
DERFLEX can discuss finished duct construction and PVC-coated textile selection together, reducing the gap between the raw material specification and the assembled ventilation line.
Collapsible flexible duct for positive-pressure fresh-air delivery. It folds compactly for transport and can be extended as the tunnel advances.
Discrete structural rings help the section retain its air passage where partial suction, route geometry or handling makes unsupported layflat construction unsuitable.
Continuous helix reinforcement is considered for negative-pressure extraction, exhaust connections and tighter routing where the duct must resist collapse.
Reducers, transitions, branches and connection sleeves can be matched to fan outlets, route changes and project drawings rather than improvised on site.
A consistent duct assembly depends on the coated textile, the seam system and the hardware working together. Each field below can be specified before production.
The ranges below are configuration references drawn from DERFLEX’s current ventilation duct product range. Final values depend on the confirmed duct construction, fan duty and project test requirements.
| Specification field | Typical project options / questions | Why it matters |
|---|---|---|
| Airflow mode | Positive-pressure supply / negative-pressure exhaust / combined system | Determines whether layflat construction is sufficient or structural reinforcement is needed. |
| Nominal diameter | Project-configured; DERFLEX positive-pressure range currently lists 300–3000 mm options | Must be coordinated with airflow volume, pressure loss, route geometry and available clearance. |
| Section length | Project-configured; current positive-pressure product range lists 5–300 m section options | Influences coupling count, transport, handling, leakage opportunities and extension procedure. |
| Duct format | Layflat / ring-supported / spiral-wire / low-headroom or custom geometry | Matches the duct’s structural behavior to pressure direction and tunnel constraints. |
| Fabric construction | PVC-coated high-tenacity polyester; weight, yarn structure and coating selected by duty | Affects tensile, tear, abrasion, flexibility, weldability and service life under handling. |
| Connection system | Zipper / ring / clamp / sleeve / hook-and-loop / custom interface | Changes installation time, seal quality, maintainability and compatibility with existing lines. |
| Suspension | Continuous fin / eyelets / straps / hooks / reinforced points | Needs to match spacing, tunnel support method and the mechanical load of long sections. |
| Safety treatments | Flame-retardant and/or antistatic formulations where required | Acceptance should reference the customer’s named standard, resistance limit and test method. |
| Environment | Abrasion, water, dust, oil/chemical contact, temperature, repeated folding | Determines coating and reinforcement details rather than relying on a generic “heavy duty” label. |
For a useful quotation, the tunnel ventilation duct manufacturer should evaluate the fan, route and operating conditions before locking the fabric and hardware package.
The duct configuration should be adapted to the excavation method, available clearance, contaminants and how frequently the ventilation line must move.
Fresh-air delivery and exhaust routing during drill-and-blast or mechanical excavation, with frequent route extension as the heading advances.
Long temporary ventilation routes where leakage control, manageable section lengths and reliable suspension become important to useful airflow at the face.
Confined urban worksites may require flexible routing around equipment, shafts and cross passages while maintaining defined ventilation paths.
Large underground works often combine long routes, high humidity and demanding handling conditions that should be included in material selection.
Temporary supply or extraction lines can connect fans to changing work zones during excavation, lining, equipment installation and finishing stages.
Tunnel and mine ventilation share many duct design principles, especially pressure direction, extension strategy, abrasion exposure and safety requirements.
A flexible duct that is strong in the warehouse can still underperform underground if joints leak, the inner surface is rough, suspension creates local tears, or the duct is repeatedly dragged across sharp surfaces. Useful airflow at the working face is therefore a system outcome rather than a single fabric number.
Fewer weak interfaces, repeatable welded seams and couplings that match the site’s installation practice can reduce unnecessary air loss. Long routes deserve particular attention because small losses accumulate over multiple sections and connections.
Tunnel crews may extend, remove, store and reinstall duct sections many times. Reinforcement around hanging points, ends and hardware interfaces can be more useful than increasing fabric weight everywhere. This is why DERFLEX recommends discussing handling and suspension before finalizing the material.
For contractors, ventilation-system integrators and distributors, supplier evaluation should focus on whether the factory can turn a route requirement into a repeatable finished duct—not on promotional claims.
DERFLEX’s current ventilation range covers both the coated textile and finished flexible ducting. That allows purchasing teams to discuss material construction and assembly details in the same technical conversation.
DERFLEX manufactures PVC-coated technical textiles and can match fabric structure, coating and optional treatments to the intended duct duty.
Current product pages cover welded duct bodies, selected couplings, reinforced suspension details and wire-supported configurations.
Diameter, section length, airflow direction, connection method and installation hardware can be discussed against a route rather than sold as one fixed SKU.
Fire, antistatic, pressure and temperature requirements are treated as project fields that should be tied to the requested standard or test method.
These six internal resources support the same procurement path—from general flexible ducting through pressure mode, safety treatments and PVC duct material selection.
For a more useful tunnel ventilation duct quotation, include fan airflow/pressure, route length, required diameter, airflow direction, coupling preference, suspension method and any named fire or antistatic test requirement. DERFLEX can then review the duct construction against the project conditions.
Provide airflow mode, fan airflow and static pressure, outlet size, total route length, required diameter, section length, bends or branches, coupling and suspension preference, environmental conditions, and any project-specific flame-retardant or antistatic standard. This produces a more reliable configuration than quoting from diameter alone.
Layflat ducting is commonly used for positive-pressure air supply because fan pressure inflates the tube. Spiral or ring-supported ducting maintains its shape and is generally considered when the system operates under suction/negative pressure, connects to exhaust equipment, or needs more structural stability through bends.
DERFLEX offers flame-retardant and antistatic material configurations by project requirement. The requested acceptance standard, resistance limit and test method should be stated before production so that the supplied construction and documentation can be reviewed against the project specification.
DERFLEX’s current positive-pressure mine ventilation duct range lists configurable diameters from 300 to 3000 mm and section-length options from 5 to 300 m. Final dimensions depend on airflow, pressure, route clearance, handling and the selected duct construction.
Every joint and hanging point is part of the operating system. Couplings influence installation speed, air leakage and extension work, while suspension details must carry the duct without concentrating stress that can create local tears. These interfaces should be approved together with the duct body.
Yes. Custom reducers, transitions, sleeves, branches and connection details can be discussed from fan dimensions and project drawings. Confirming these interfaces before production reduces field modification and helps keep the ventilation route consistent.